September Building Progress

The guestroom walls have now been completed and the top floor roof slab poured.  The top floor area is much smaller than the ground floor,  so this time the slab was completed in a couple of hours, rather than taking all day. The ground floor window and door frames were assembled onsite by a team of carpenters and installed so the renderers could start work on the interiors.  Some sections have been left unrendered so decorative panels can be added at a later stage.

The pulley system used to lift the concrete up to the roof.

Pouring the roof slab of the upper floor guestrooms

Carpenters assembling the window frames

The downstairs sleeping rooms with render and window and door frames

Adding render and decorative features to the front elevation of Shammah House